Roadmap
Nine milestones, published as they land.
The physics is fixed first. Silicon starts early, because fabrication takes months.
-
M1
Bench validated
Resonance measured: frequency, quality factor, phase slope. Rig and method published.
-
M2
Prototypes
Machined parts, revised board, ten assembled units.
-
M3
Calibration
Reference bench, correction tables and a certificate per piece.
-
M4
Firmware v1
Measurement, servo, motion compensation, quality flag.
-
M5
Measurement campaign
Against a reference sensor; accuracy report published.
-
M6
RTL + FPGA
The whole measurement chain validated on the real cavity.
-
M7
First silicon
Shared-shuttle tapeout, analogue front-end on the die.
-
M8
Characterised measurement core
Phase measurement characterised in silicon, ready for the instrument.
-
M9
First series
Numbered pieces, calibrated one by one, delivered with their signed certificate.